Snow day staffing is a scheduling problem your tool can’t solve for you, because the schedule was right on Sunday and wrong by 7am Monday. What decides how the day goes is whether you can see, within the first hour, who isn’t coming in, why, and which skills just walked out with them. Britain’s snow on 2 February showed how big that gap can get.
Last year I wrote about call centre scheduling software and whether Excel is enough. My answer was that a spreadsheet can hold a schedule but can’t defend it. A snow day is the purest test of that sentence I can think of, because nothing about the schedule was wrong. The world just stopped matching it.
I used to think the answer to a snow day was getting more people in. Usually it isn’t. It’s knowing exactly who you have, and taking everything off their plate that isn’t a customer.
How big was the snow day?
Big enough to show up in national figures. According to Channel 4 News, the Federation of Small Businesses estimated that about one in five people, some 6.3 million, didn’t make it into work, at a cost to the economy of £1.26bn. The same coverage reported a row over whether people who stayed home should lose a day’s pay or a day’s holiday.
London lost its entire bus service for the morning. Heathrow closed runways. Schools across the south east shut on the Monday and many stayed shut on the Tuesday. Each of those facts lands on a different group of your staff, which is the whole problem, and I’ll come back to it.
One in five is a useful number for a scheduler, because it’s roughly what a snow day does to your team too. If you run a 50-seat centre, that’s 50 / 5 = 10 people. In a team of 200, it’s 200 / 5 = 40. You can’t absorb that with the shrinkage allowance in your normal plan. Shrinkage covers a normal Monday. This wasn’t one.

Why doesn’t the schedule just flex?
Because a schedule is built from averages, and a snow day isn’t average. Your planned shrinkage covers ordinary sickness, holidays, training and meetings, spread fairly evenly across the week. If you built it the way I described in calculating shrinkage from your own timesheets, it’s an honest average of the last few months. A snow day concentrates a month’s worth of absence into one morning and, worse, it isn’t random.
Think about who doesn’t make it in. The people with the longest commutes. The people who rely on one rail line or bus route. The parents whose children’s schools have closed. Those groups aren’t spread evenly across your skills. If your second-line team mostly lives out of town, or your French speakers all came from the same recruitment drive near the same station, you may lose 50 percent of one skill and 10 percent of another. Your overall attendance figure will look survivable. Your queue for that skill won’t be.
Here’s what that looks like with numbers. Take an illustrative 50-seat centre with four skills: 30 general agents, 10 billing, 6 French speakers and 4 second line. Ten people ring in. Four are general, two are billing, three are French and one is second line. The headline is 10 / 50 = 20 percent absent, and 40 of 50 in, which is 80 percent. Now look skill by skill:
- General: 4 / 30 = 0.13, so 13 percent missing.
- Billing: 2 / 10 = 0.2, so 20 percent missing.
- Second line: 1 / 4 = 0.25, so 25 percent missing.
- French: 3 / 6 = 0.5, so half the skill has gone.
Same morning, same ten people. The 20 percent figure is the one that goes in the email to the directors. The 50 percent figure is the one your French-speaking customers will feel. That’s the first thing a scheduling tool should show you on a bad morning: not “how many people are in,” but “which skills are now short, by how much, and for which hours.”
So what does shrinkage look like on the day? Worse than the plan, and also more fixable than people assume. Say your plan carries 30 percent shrinkage. That means of every hour you pay for, 30 percent goes on things that aren’t answering customers: breaks, training, coaching, team meetings, sickness. With 50 rostered, the number actually available at any moment is 50 x (1 – 0.30) = 50 x 0.7 = 35.
Lose 10 to the snow and leave everything else alone, and you get 40 x 0.7 = 28 available. That’s 35 – 28 = 7 fewer people on the phones than the plan assumed, a drop of 7 / 35 = 20 percent.
Now cancel the things you can cancel. Suppose half of that 30 percent is planned activity: training, coaching and meetings, 15 points in all. The other 15 points are breaks and the ordinary absence you can’t touch. Cancel the planned half for the day and shrinkage falls to 15 percent, so the 40 who made it give you 40 x (1 – 0.15) = 40 x 0.85 = 34 available. That’s within one person of the 35 you planned for, with ten fewer people in the building.
That’s why I stopped treating a snow day as a recruitment problem. The training session can move to Thursday. The customer can’t.
Does demand change too?
Usually, and not always in the direction you’d hope. Some contacts disappear because your customers are snowed in too. Others appear because the weather has created new problems: missed deliveries, cancelled appointments, people working from home for the first time and calling about access.
As I covered in mind the gap, the schedule only means something next to the required-agents line. On a snow day you have to redraw both. Re-forecast the morning from what’s actually arriving in the first hour, not from last Monday.
The simplest honest method is a ratio. Say last Monday’s 09:00 to 09:30 half hour brought 400 calls, and this morning the same half hour brought 340. That’s 340 / 400 = 0.85, so demand is running at 85 percent of normal. Apply that to the rest of the morning: if the 10:00 half hour normally brings 420 calls, plan for 420 x 0.85 = 357.
Then turn calls into workload. If your average handling time is 300 seconds, 357 calls x 300 seconds = 107,100 seconds of work. A half hour holds 30 x 60 = 1,800 seconds, so 107,100 / 1,800 = 59.5. That 59.5 is the workload in Erlangs: the number of agents you’d need if every one of them was busy every second with no queue at all. Nobody runs at 100 percent, so feed that volume back into your Erlang C numbers to get the real required agents for your service level target. You may find that a day which looked like a disaster is merely bad, or that the one queue you weren’t watching is the one that will break.
What should your tool capture when someone calls in?
More than “absent.” A one-word absence code tells you nothing you can act on. For a weather day, capture three things for each person:
- Why they’re not in: transport, childcare, or illness. Each recovers on a different timeline. Transport may improve by lunchtime. School closures probably won’t.
- Whether they can work from home, and if so, which systems they can actually reach from there.
- When they expect to make it in, if at all.
If you’re on a spreadsheet, make this a sheet of its own and call it CallIns. Row 1 holds the headings and each person who rings in gets one row underneath, starting at row 2. Column A is their name. Column B is their skill, typed exactly as it appears in your skills list (General, Billing, French, Second line). Column C is the reason: Transport, Childcare or Illness. Column D is Y if they can work from home with working access, N if not. Column E is the time they expect to arrive. For anyone who isn’t coming at all, type 23:59, so the sheet treats them as arriving after the last interval of the day.
With those fields, your absence list stops being a register and becomes a plan. You’ll know who might arrive at 11, who could log in from home if someone sent them the right access, and who’s gone for the day. Without them, you’ll spend the morning ringing round to find out.
How do you build a bad-day sheet in Excel?
Build it now, on a calm afternoon, in the same workbook as CallIns. Call the second sheet BadDay. It has one row for every skill in every half hour. With four skills and a day running 08:00 to 18:00, that’s 10 hours x 2 = 20 half hours, and 4 x 20 = 80 rows, which sit in rows 2 to 81 under a heading row.
- Column A, Skill: the skill name, matching CallIns column B exactly.
- Column B, Interval: the start time of the half hour, such as 09:00.
- Column C, Required: agents needed for that skill in that half hour, typed in from your Erlang C working.
- Column D, Rostered: how many people with that skill the schedule had down for that half hour.
- Column E, Missing: worked out from CallIns, explained below.
- Column F, Available:
=D2-E2, rostered minus missing. - Column G, Gap:
=F2-C2, available minus required. Negative means short.
Column E is the only clever bit. In E2, type =COUNTIFS(CallIns!$B$2:$B$60,A2,CallIns!$D$2:$D$60,"N",CallIns!$E$2:$E$60,">"&B2) and fill it down to row 81. In words, it counts the rows on CallIns where three things are all true. The first pair, CallIns!$B$2:$B$60,A2, keeps only people whose skill matches this row’s skill. The second pair, CallIns!$D$2:$D$60,"N", keeps only people who can’t work from home, because anyone logged in from the kitchen table is still available. The third pair, CallIns!$E$2:$E$60,">"&B2, keeps only people whose expected arrival is later than this half hour’s start time. The ">"&B2 part glues the greater-than sign to the time in column B, so the 09:00 row asks “arriving after 09:00?” The dollar signs fix the CallIns ranges in place so they don’t slide as you fill down. Rows 2 to 60 give room for 59 call-ins, more than a 50-seat centre will ever need.
Back to the illustrative centre. The French row for 09:00 has 5 required in C and 6 rostered in D. Three French speakers rang in, none can work from home, and none expects to arrive before 23:59, so E counts 3. F is 6 – 3 = 3 available. G is 3 – 5 = -2, two short. The General row for 09:00 might show 24 required and 30 rostered, with 4 missing: F is 30 – 4 = 26 and G is 26 – 24 = +2, two spare. That’s your answer before anyone has finished their coffee: offer French-speaking callers a callback, and check whether either of the two spare general agents speaks French.
Two summary cells finish it. In J1, =COUNTIF(G2:G81,"<0") counts how many skill-intervals are short. In J2, =SUMIF(G2:G81,"<0") adds up only the negative gaps, so -2 in one row and -1 in another gives -3: three agent-half-hours missing in total. Add conditional formatting to column G that turns any cell below zero red. Practise filling it in once. On the morning, the person who’s done it before will be faster than any software you haven’t configured.
What should you decide before the next one?
Most of the snow day response can be decided in advance, on a calm afternoon, by a team that isn’t panicking. Do it now, while February is fresh in everyone’s memory.
- Priority queues. If you can only staff some queues properly, which ones? Write the order down. On the day, nobody should be debating whether billing beats new orders.
- Who covers what. Your skills matrix should show, for every scarce skill, who else can do it at a pinch. If the answer for any skill is “nobody,” that’s your training plan for the spring.
- Message changes. A pre-written recorded message and website note explaining longer waits and suggesting self-service options. Approve the wording now.
- The call-round. Who phones whom, by when, and where the results go. The answer should be one shared sheet, the CallIns sheet above, not five supervisors’ notebooks.
- The pay question. Decide your policy on staff who can’t make it in before it happens, so supervisors aren’t making it up one call at a time.
The pay question surprises people, but it matters for staffing. Acas guidance on disruption getting to work says employers should plan ahead, shouldn’t push people to travel when it isn’t safe, and should be clear about whether pay is affected. It also points out that employees have a right to time off for dependants when a school closes, which is exactly what a snow day does. Teams who believe they’ll be treated fairly are far more likely to try to get in, or to log in from home, than teams who expect to be docked whatever they do.
Fairness is a staffing lever. It just doesn’t show up in the workforce tool.
How fast should you re-plan on the day?
Within the first hour, and again at about 10:30. The first re-plan uses absence calls and the first 30 minutes of volume. The second uses the actual pattern of arrivals: who made it in late, which queues are building, what the customers are actually calling about. When someone on CallIns arrives, change their time in column E to the actual arrival and every BadDay row after that time updates by itself.
It’s the same discipline I wrote about after Northern Rock’s call centres were swamped: intraday staffing is a loop, not a decision. Re-plan every two hours after the second pass, or whenever something big changes.
A leading indicator, such as transport updates, school closure lists, or a rising number of “where’s my delivery” calls, will usually tell you what the afternoon looks like before the queue does. Use it. If the council posts that schools will stay shut tomorrow at 2pm, Tuesday’s childcare absences are already decided, and you can start Tuesday’s CallIns sheet before anyone rings.
What about the people who do make it in?
They carry the day, and they notice how it’s handled. The agents who left home at six to get through the snow are the ones taking longer queues, covering skills they don’t normally do, and hearing from customers who are frustrated by the wait. If the only message they get from management is about the people who didn’t arrive, you’ll lose goodwill you need for the next bad day.
Say thank you early, on the floor, not in an email at five o’clock. Relax the targets that no longer make sense: nobody should be measured against a normal service level on a day when a fifth of the team is missing. Make sure breaks still happen. Those are the 15 points of shrinkage you can’t cancel, and a team running flat out with no breaks will be slower by mid-afternoon than one that stopped for twenty minutes.
And if you’re moving people onto unfamiliar queues, give them something to work from. A one-page crib sheet for each scarce skill, written in advance, turns “I’ve never done billing” into “I can handle the basics and pass the rest on.” It won’t make anyone an expert in an hour. It will stop the queue from filling with transfers.
What should you measure afterwards?
Not just the service level, which will be bad and tells you nothing new. Measure three things, each from a timestamp you already have.
- Time to know: when the last absence was confirmed, minus the start of the first shift. If the first shift starts at 07:00 and the last call-in is logged at 08:45, that’s 1 hour 45 minutes, or 105 minutes, of running blind.
- Time to re-plan: when the revised schedule went out, minus when the last absence was confirmed.
- First skill to run out: the earliest BadDay row that turned red, and which skill it was.
Those three numbers tell you what to fix before next winter. If time to know is the long one, fix the call-round. If time to re-plan is the long one, fix the sheet. If the same skill ran out first, fix the skills matrix.
So is it time for a proper workforce tool? Maybe. A well-built spreadsheet can hold the skills matrix, the absence fields and the revised required-agents line, and the BadDay sheet above does most of what you need for a centre of 50. What it can’t do easily is show you all of it together, by interval, updating itself from the phone system as the morning changes. Above a couple of hundred seats, or with more than six or seven skills, that’s exactly the moment a proper workforce tool earns its licence fee.
Shrinkage isn’t a percentage. It’s people, and on the worst days they don’t go missing at random. Your schedule will always be built on averages. Your snow day plan has to be built on names.
The weather decides who can’t come in. You decide whether the customers notice.
Which skill would run out first in your centre if a fifth of the team couldn’t get in tomorrow? Tell me in the comments.
Hutch Morzaria is a Director-level CX and Support Leadership professional with 19 years of experience building global support organizations across SaaS, Fintech, and enterprise technology. He has hired dozens of support and CX leaders across his career and holds ITIL Expert certification across V3 and V4.